Project notes
What went into this build.
A walk-in master shower that had been hiding a leak under failing grout. Stripped to the studs, waterproofing replaced with Schluter Kerdi, and rebuilt with large-format wall tile and a custom niche. Regrouting and tile repair handled on the adjoining floor in the same job.
Before-and-after photographs show the rebuild — original failing surround on one side, finished walk-in on the other.