Skip to content
Naron
Kitchen Remodeling project by NARON Remodel Services

PRIMARY SERVICE

Kitchen Remodeling

Custom kitchen builds — cabinetry, counters, backsplash, flooring, lighting — done by one craftsman from demo through final walk-through.

About this service

From a single cabinet run to a full kitchen tear-out, Naron handles the build personally. Honest estimate up front. Daily communication on the job. A finish that holds up to the way Utah families actually use a kitchen.

A kitchen is the room that has to take everything — heat, water, weight, time, every single day. Naron has been building them for over eight years. The cabinets sit straight. The grout lines are dead even. The sink drops in flush. The drawers close the way they should three years from now, not just in the listing photos.

Every kitchen Naron builds is run by Naron. One name on the schedule. One person responsible from rough-in through walk-through.

Process

How a kitchen remodeling project actually runs.
actually runs.

  1. 01

    Consult

    We talk through what you want the kitchen to do. Naron walks the space, measures, and notes constraints — load-bearing walls, plumbing runs, where light wants to be.

  2. 02

    Estimate

    A clear, written estimate. No hidden fees. Material allowances called out by line so you know what's spec'd and what's a finish-grade upgrade.

  3. 03

    Build

    Demo, rough-in, cabinetry, counters, tile, paint, finish carpentry. Daily check-ins. The job site is left clean every evening.

  4. 04

    Walk-through

    Final punch list before invoice. Anything that's not right gets fixed. The work isn't done until you say it's done.

Answers

Kitchen Remodeling — common questions.
ask Naron.

What does a kitchen remodel actually cost?

It varies with scope and finishes. Naron's estimates are upfront and itemized — material allowances called out separately so a quartz vs. porcelain swap is a transparent line, not a surprise. For bigger projects he offers package pricing.

How long does a typical kitchen take?

A focused kitchen — cabinetry, counter, backsplash, paint — typically runs 3–6 weeks once materials land. A full gut with new layout and electrical can run 6–10 weeks. Naron sets a finish date in the estimate and protects it.

Do you handle the design or do I bring my own?

Either works. Naron will walk the space and explain the options for layout, materials, and finishes. If you arrive with a designer's plan he builds to spec. If you don't, he'll guide the choices that drive cost and durability.

Can I keep using my kitchen during the remodel?

Plan on a temporary kitchen elsewhere in the house for the heavy demo and rough-in stretch — typically the first 1–2 weeks. After cabinets are set most clients can use the sink and a portable cooktop while finish work continues.

Why hire Naron

Built to last in the home
you actually live in
finished by the man
who runs the company.

Free estimate

Tell Naron
what you're thinking.

Three quick steps. No obligation. Naron personally reviews every estimate request and gets back within one business day.

  • Upfront pricing, no hidden fees.
  • Owner-operated. Naron is the one bidding.
  • Licensed & insured. 32× hired on Thumbtack.

Step 1 of 3

What are you planning?

By submitting, you'll get a personal reply from Naron within one business day. We never sell or share your details.